Event Summary
 
  FILE SAVED AS: ONT_9159_20200502_1015.htm  
 
 Incident:   ONT_9159_20200502_1015   Date:  05/02/2020 (CST)   Reliability Coordinator:  ONT 
 Initial Conditions:   N/A
 Flowgate:   9159 - ONTARIO-ITC   Rating:  0   LODF:   N/A
 TLR Direction:   Normal 
 Effective StartTime:   05/02/2020 10:15 (CST)   Effective EndTime:  05/03/2020 01:45 (CST)   TLR Duration:  15 Hours and 30 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
May 02 
10:11 (CST) 
 TLR 1   CURRENT   NONE   NONE   NONE   1650   N/A  N/A LEC at 250 MW ccw
May 02 
10:33 (CST) 
 TLR 3A   NEXT 
 2-NH 
 6-NN 
 7-F 
 Total 
 6 / 3 
 0 / 3 
 0 / 2 
 6  /  8 
 602 
 0 
 0 
 602 
 44.2 
 0.0 
 0.0 
 44.2 
 602 
 0 
 0 
 602 
 44.2 
 0.0 
 0.0 
 44.2 
 30 
 300 
 16 
 346 
 2.2 
 22.0 
 1.0 
 25.2 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1570   N/A  N/A LEC at 170 MW ccw
May 02 
11:30 (CST) 
 TLR 3A   NEXT 
 2-NH 
 5-NM 
 6-NN 
 7-F 
 Total 
 0 / 3 
 0 / 1 
 0 / 3 
 0 / 1 
 0  /  8 
 0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 30 
 100 
 300 
 167 
 597 
 2.1 
 7.1 
 21.3 
 97.4 
 127.8 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1240   N/A  N/A LEC at 30 MW cw
May 02 
12:31 (CST) 
 TLR 3A   NEXT 
 2-NH 
 5-NM 
 6-NN 
 7-F 
 Total 
 6 / 6 
 0 / 1 
 0 / 3 
 0 / 1 
 6  /  11 
 479 
 0 
 0 
 0 
 479 
 29.1 
 0.0 
 0.0 
 0.0 
 29.1 
 479 
 0 
 0 
 0 
 479 
 29.1 
 0.0 
 0.0 
 0.0 
 29.1 
 255 
 100 
 300 
 200 
 855 
 15.5 
 6.1 
 18.3 
 116.4 
 156.2 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1215   N/A  N/A LEC at 40 MW cw
May 02 
13:27 (CST) 
 TLR 3A   NEXT 
 2-NH 
 6-NN 
 7-F 
 Total 
 0 / 5 
 0 / 3 
 0 / 1 
 0  /  9 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 351 
 300 
 200 
 851 
 21.4 
 18.3 
 116.5 
 156.2 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1303   N/A  N/A LEC at 60 MW cw
May 02 
14:27 (CST) 
 TLR 3A   NEXT 
 2-NH 
 5-NM 
 7-F 
 Total 
 0 / 5 
 0 / 1 
 0 / 1 
 0  /  7 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 205 
 50 
 159 
 414 
 12.6 
 3.1 
 92.5 
 108.1 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1484   N/A  N/A LEC at 25 MW cw
May 02 
15:32 (CST) 
 TLR 3A   NEXT 
 2-NH 
 5-NM 
 6-NN 
 Total 
 10 / 1 
 0 / 1 
 0 / 1 
 10  /  3 
 233 
 0 
 0 
 233 
 13.2 
 0.0 
 0.0 
 13.2 
 233 
 0 
 0 
 233 
 13.2 
 0.0 
 0.0 
 13.2 
 100 
 25 
 100 
 225 
 5.7 
 1.4 
 5.7 
 12.8 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1283   N/A  N/A LEC at 50 MW cw
May 02 
16:32 (CST) 
 TLR 3A   NEXT 
 2-NH 
 6-NN 
 Total 
 6 / 0 
 11 / 0 
 17  /  0 
 910 
 1686 
 2746 
 52.4 
 97.1 
 149.6 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1078   N/A  N/A LEC at 350 MW cw.
May 02 
16:36 (CST) 
 TLR 3A   NEXT 
 2-NH 
 5-NM 
 6-NN 
 Total 
 6 / 2 
 0 / 1 
 11 / 1 
 17  /  4 
 910 
 0 
 663 
 1723 
 52.4 
 0.0 
 38.2 
 90.6 
 760 
 0 
 663 
 1423 
 43.8 
 0.0 
 38.2 
 82.0 
 350 
 100 
 100 
 550 
 20.2 
 5.8 
 5.8 
 31.7 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1078   N/A  N/A LEC at 350MW CW
May 02 
17:31 (CST) 
 TLR 3A   NEXT 
 2-NH 
 5-NM 
 6-NN 
 Total 
 4 / 1 
 1 / 0 
 10 / 0 
 15  /  1 
 760 
 100 
 13 
 873 
 47.2 
 6.2 
 0.8 
 54.2 
 760 
 100 
 13 
 873 
 47.2 
 6.2 
 0.8 
 54.2 
 225 
 0 
 0 
 225 
 14.0 
 0.0 
 0.0 
 14.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1479   N/A  N/A LEC at 100MW CCW
May 02 
18:32 (CST) 
 TLR 3A   NEXT 
 2-NH 
 5-NM 
 6-NN 
 Total 
 4 / 1 
 1 / 1 
 10 / 0 
 15  /  2 
 785 
 100 
 34 
 919 
 46.3 
 5.9 
 2.0 
 54.3 
 785 
 100 
 34 
 919 
 46.3 
 5.9 
 2.0 
 54.3 
 100 
 50 
 0 
 150 
 5.9 
 3.0 
 0.0 
 8.9 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1780   N/A  N/A LEC at 380MW CCW
May 02 
19:33 (CST) 
 TLR 3A   NEXT 
 2-NH 
 5-NM 
 6-NN 
 Total 
 4 / 4 
 1 / 0 
 11 / 1 
 16  /  5 
 585 
 50 
 590 
 1225 
 34.1 
 2.9 
 63.2 
 100.3 
 585 
 50 
 590 
 1225 
 34.1 
 2.9 
 63.2 
 100.3 
 127 
 0 
 100 
 227 
 7.4 
 0.0 
 5.8 
 13.2 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1630   N/A  N/A LEC at 350MW CCW
May 02 
20:28 (CST) 
 TLR 3A   NEXT 
 2-NH 
 5-NM 
 7-F 
 Total 
 0 / 3 
 0 / 1 
 0 / 1 
 0  /  5 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 3 
 100 
 5 
 108 
 0.2 
 6.2 
 2.9 
 9.3 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1600   N/A  N/A LEC at 250MW CCW
May 02 
21:30 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1545   N/A  N/A LEC at 150MW CCW
May 02 
21:47 (CST) 
 TLR 1   CURRENT   NONE   NONE   NONE   0   N/A  N/A N/A
May 03 
01:25 (CST) 
 TLR 0   CURRENT   NONE   NONE   NONE   0   N/A  N/A N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   0   0   0   0 
 2   46   5264   4204   1776 
 3   0   0   0   0 
 4   0   0   0   0 
 5   3   250   250   525 
 6   53   2986   1300   1500 
 7   0   0   0   747 
 Total   102   8500   5754   4548 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 MISO   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total MISO   0.0   0.0 
 PJM   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total for PJM   0.0   0.0 
 Total   0.0   0.0